Route 30 Pressure Sewer Project

Salyersville Water Works retained Summit to provide funding assistance, design services, and construction inspection services for the Route 30 Pressure Sewer Project. The project exteneded sanitary sewer force main to approximately 30 residences along Route 30 in Magoffin County, KY. The contractor installed a new grinder pump and force main at each residence, which connected […]

Salyersville Water Tank

The Salyersville Water Storage Tank Project replaced a failing 200,000 gallon water storage tank with a new 500,000 gallon glass-lined bolted steel tank. Summit’s services included funding assistance, design, construction administration, and resident inspection of the project. The project began with a study to determine the most optimal and cost-effective location to build the new […]

Mountain Parkway “Restaurant Row” Utilities Relocation 10-166

KYTC Urban Utility Relocation Project involving water line replacement, gravity sewer, dual force mains, and gas, for multiple utilities, as part of the Mountain Parkway Widening Project. The project involves seven construction phases, 85 business entrances, and required 3D alignments for all utilities to accommodate the narrowed utility corridor and avoid conflicts with storm sewer, […]

Millard Elementary School (Site work, Utilities, Access Road and Turn Lane Improvements)

Pike County Schools retain Summit Engineering in 2010 to assist with its plan to construct a new consolidated Middle and Elementary school near Millard. Summit prepared a site evaluation report for three sites within the target area evaluating site grading requirements, road access, floodplain issues, past mining activity, and development costs. The selected site was […]

Loves Travel Center

Love’s Corporation procured Summit to complete the site civil design for a new Love’s Travel Center in Greenville, VA. Summit designed the parking areas, roadways, entrances, drainage features, a new quadruple box culvert, and four bio-retention basins. Summit designed approximately 1,700 LF of entrance road with drainage ditches to VDOT standards. Summit used HEC-RAS to […]